Construction of concrete footpath 550m, earthworks, rehabilitation, drainage works, linemarking, road furniture and traffic control devices, stre
View MoreEarthworks - retaining wall excavation & construction, subsoil drainage behind retaining wall and backfilling works, relocate existing street
View MoreA general outline of the work carried out under the Contract comprised of:
View MoreExtend Existing Car Park Adjacent to Building 5 Ben Hammond Complex Contract Value - $175,000
View MoreDarwin Region – Ludmilla Creek Catchment – Flood Mitigation Works - Construction.
View MoreName | Client | Works | Location | Date |
---|---|---|---|---|
STUART HIGHWAY AND TIVENDALE ROAD INTERSECTION UPGRADE | SITZLER | Intersection upgrade, including turning lanes and lighting. | Darwin | 2023 |
MOUNT BUNDEY | BARPA | Civil works - access roads. | Darwin | 2022 |
VANDERLIN DRIVE/LEANYER DRIVE - INTERSECTION AND SHARED PATH UPGRADE | DIPL | Upgrade of the Vanderlin Dr/Leanyer Dr intersection, upgrade to surrounding shared path as well as connectivity improvements to Hibiscus Shopping Centre. | Darwin | 2022 |
ALAWA AND NEMARLUK SCHOOLS - CAR PARK UPGRADE | DIPL | Construct 44 new car parks at schools, line marking, 'Kiss and Go' parks and signage. | Darwin | 2022 |
PALMERSTON BUS INTERCHANGE - PARK & RIDE CARPARK UPGRADE | DIPL | Upgrade to internal road and car park configuration, increase number of car parks, site grading and drainage, pavement works, improve pedestrian access & safety, upgrade lighting, install bollards. | Darwin | 2022 |
RAAF TINDAL | ICON | Civil Works | 2021 | |
RAAF TINDAL | BARPA | Worker Accommodation Village | 2021 | |
T21-1089 DARWIN REGION - VANDERLIN DRIVE/LEANYER DRIVE - INTERSECTION AND SHARED PATH UPGRADE | DIPL | Widening/installing new shared path at Hibiscus Shoppingtown. Upgrades to intersection; enlargement of traffic island, new signage, signals installation and pavement marking. Reconstruction of kerb lines/drainage pit. Drain inlet pit/ramp and stairs. | Darwin | 2021 |
T20-2197 DARWIN - DURACK PRIMARY SCHOOL – CONSTRUCT NEW CAR PARKS | DIPL | Construct 43 new car parks, modify existing car park, construct footpaths and linemarking. | Darwin | 2021 |
DARWIN REGION - PALMERSTON BUS INTERCHANGE - PARK AND RIDE CARPARK UPGRADE | DIPL | Upgrade internal road configuration, car parks, site grading/drainage, reconstructing and upgrading pavement, improving pedestrian access and safety, lighting, installing energy-absorbing bollards. | Darwin | 2021 |
DARWIN REGION – HIDDEN VALLEY MOTORSPORT COMPLEX – MOTORSPORTS AUSTRALIA TRACK SAFETY UPGRADES TURNS 11-14 | DIPL | Removal existing tyre wall turn 11-14. Placement of reinforced concrete barrier panels including supply/install of galvanised connection plates. Earthworks excavation/shaping for installation of new barrier. Concrete barrier works. Swale & drainage works. | Darwin | 2021 |
67 BENISON ROAD - NEW WAREHOUSE - CIVIL WORKS | Norbuilt | Demolition, vegetation clearing, earthworks inside retaining wall. Earthworks in cut; carpark/warehouse, prep subgrade. Pavement & shoulders, spray sealing, concrete/kerb/gutter works, road furniture & stormwater. | Darwin | 2020 |
RAAF DARWIN - LAND121 STAGE 2A UNIT SUSTAINMENT FACILITIES - CIVIL WORKS | McMahon Services | Civil earthworks, spray sealing, asphalt, kerbs & gutters. Road furniture & traffic control devices. Drainage works, landscaping & sediment. | Darwin | 2020 |
PALMERSTON REGIONAL HOSPITAL - MISCELLANEOUS ROADWORKS - CONSTRUCTION | DIPL | Maintenance of roads/verges Glyde Pt Rd, Linco Rd, PRH Access R1 and PRH Access R2. Remarking all existing pavement markings, installation new line markings, reflective pavement markers. R&R signage. TGSI kerb ramps, rectification asphalt, streelighting. | Darwin | 2020 |
BLACK SPOT GIRRAWEEN HILLIER INTERSECTION UPGRADE | Litchfield Council | Earthworks & grubbing, construction of channelised RH turn lane from Girraween Rd into Hiller Rd inbound. Pavement works incl. supply, placement & compaction of subgrade, subbase, & pavement sealing. Culvert extension works, realignment of table drains. | Darwin | 2020 |
Yarrawonga - Stuart Highway Shared Path - Tulagi Road to Yarrawonga Road | DIPL | Construction of concrete footpath, earthworks, drainage works, landscaping, linemarking, road furniture & traffic control devices, streetlighting. | Darwin | 2019 |
Cox Peninsula Road/Finn Road Intersection Left Turn | DIPL | Construction of new left turn lane, realign drainage, line marking, mountable gap kerb, relocate existing signs. | Darwin | 2019 |
Darwin Region - Farrar Boulevard and Damabila Drive - Upgrade of Bus Stops 375 and 644 | DIPL | Demo existing paths/kerbs/slabs, earthworks, preparation & maintenance of subgrade for new slabs & footpaths, excavation of footings, concreting, landscaping, install new bus shelters, tactiles, signage and line marking. | Darwin | 2019 |
Installation of Below Ground Conduits - Power & Water, Alice Springs | Yurika - Energy Queensland Group | Installation of new below ground electrical conduits connecting previously installed above ground Power & Water Corporation assets to a number of fixed locations, supply materials, trenching, backfilling. | Alice springs | 2019 |
Trower Road - construction of right turn lane into Alawa Crescent (East) | DIPL | Demolition, including removal of existing concrete median, vegetation, streetlights and air valve, construction of a new right turn lane, including new asphalt paving, mountable kerb, linemarking, supply new streetlight. | Darwin | 2019 |