The construction of package 3 (Kart Track) for a new water main for Hidden Valley Motor Sports Complex consist of the following:
· New water main, 250 diameter (ND) HDPE;
· New irrigation points (5) and house connections (5) as directed;
· Approval of the new water main construction by PWC; and
· New internal meter assembly (Non-PWC).